Command Center

Total clients

12

Live

3

In flight

9

5 launch · 4 build

Urgent (CLI)

5

P1 in Linear

🤝 Why this page exists

On 2026-05-15, Linq retired and Aria absorbed the COO role for Aspire Digital LLC alongside her existing personal Chief-of-Staff role. Same human (Topher), one chat to open in the morning, both lives surfaced.

The specialist agents — Vegas, Sahara, Circa, Strat, Paris — stay separate. They're real builders with their own tooling and brief format. Aria coordinates and dispatches; specialists execute.

To dispatch a specialist: in a fresh Aria chat, type 1H (lane 1 / task H = Handoff). Aria asks for specialist + client + task, runs the canonical brief generator, emits the prompt inline. Topher copies it into a fresh specialist chat. Same brief the web Prompt Generator produces — zero quality loss.

Urgent — Aspire Digital LLC (Linear CLI team)

🔵

Modern Maid — pull Pulse CRM API docs (gating item for proposal)

Project: Modern Maid — build to launch

CLI-101 on Linear ↗
🔵

EPIC: Deploy architecture standardization — git-connected studio→launch→production for every client

Project: Agency Operations

CLI-117 on Linear ↗
🔵

TCYM: Grace verbatim scripts v1 — family first-call / removal / preneed + demo-home fact sheet

Project: Aspire Concierge — product build · State: In Progress

CLI-158 on Linear ↗
🔵

TCYM: LC phone + A2P + Grace Voice AI v1 on hub — live demo number

Project: Aspire Concierge — product build · State: In Progress · Due: 2026-05-15

CLI-40 on Linear ↗
🔵

10-call QA on Concierge — Topher dials, Circa reviews transcripts

Project: Made by Aspire — care & updates · State: Triaged

CLI-8 on Linear ↗

🗂️ Client pipeline

Live read of aspire-digital/playbook/src/data/clients.json at build time.

Live in production

(3)

PhotosbyB4

photosbyb4

SEO + GHL integration needed

Next: Wire GHL contact forms + kick off first monthly SEO report · Circa + Strat

NRX Asphalt

nrx-asphalt

Simple site live. Astro 6 rebuild planned.

Next: Scope Astro 6 rebuild with Tex — scaffold once confirmed · Topher

Made By Aspire

madebyaspire-com

Agency site fully live on CF Workers — production cutover from Pages → Workers completed 2026-05-06. GHL contact form integration verified end-to-end on madebyaspire.com (real submit lands a contact + opportunity in Aspire Sales/New Lead). Old aspire-digital-prod Pages project preserved dormant as rollback target.

Next: Open: add Closed/Lost stage to Aspire Sales pipeline (Topher UI, ~30s — pipeline CRUD is API-blocked). Optional: bind FORM_RATE_LIMIT KV namespace to enable the 4th spam layer; capture business_name + business_website + how_they_found_us on the form (custom fields exist in GHL but aren't surfaced in the UI). · Vegas + Circa

In launch (UAT)

(5)

Keeler Carpentry

keeler-carpentry

Guide sent to Chad for review. Site on launch domain.

Next: Follow up with Chad on launch guide review, then DNS cutover to production · Topher

Tees Flooring

tees-flooring

Promoted to launch 2026-04-23. Homepage + reviews + design library live. Guide page not yet built.

Next: Build client guide page, then share launch URL with Tony for review · Jaime + Vegas

PetalsWings

petalswings

Guide sent to Bonnie for review. Full SSR site on launch domain.

Next: Follow up with Bonnie on launch guide, then production cutover for petalswings.com · Topher

The Modern Maid

modern-maid

Site deployed to launch. Awaiting Topher + Jaime review before sharing with Amanda. GHL booking embed + cleaner tenure data still pending.

Next: Topher reviews launch URL, approve for client share · Topher

Delaware Lanes

delaware-lanes

Site live on launch subdomain. 8 pages built and QA-passed. Pending from Kris: lane pricing, shoe rental price, Alpha Night schedule. Production cutover awaiting client review + Topher approval.

Next: Share launch URL with Kris for review; collect pending pricing data; build Website Reveal doc · Topher (client review) → Jaime (Website Reveal)

In build

(4)

Patina Salon

bookpatina

Astro rebuild in progress with client Kayla. Window cling brief finalized 2026-04-19 — HPC color rendering PDF ready for Kayla to submit to City of Delaware.

Next: Kayla to submit HPC Certificate of Appropriateness application with the color rendering PDF; Jaime places VistaPrint order after approval · Kayla (application) → Jaime (VistaPrint order)

B Clean Carpet

b-clean-carpet

New client. Bryan Wilson (family). Astro 6 build starting. Portfolio showcase, not paid retainer.

Next: Scaffold site structure and kick off first design pass with Bryan's input · Jaime + Vegas

Willowbrook HOA

willowbrook-hoa

New client — HOA community site. Topher is board president. Migrating off Google Sites (delawarewillowbrook.com). Aria authored full DRB content already. Awaiting Jaime Phase 2 design pass.

Next: Jaime Phase 2 design pass — turn Aria's DRB content into the finished community site · Jaime

Heel Quik

heel-quik

48-year Atlanta cobbler at Lenox Square. 178 reviews, 4.4★. Brand LOCKED (Script & Stiletto). Palette hexes + gold-budget rule locked. Design research v2 + design library v1 published 2026-05-15. Astro 6 scaffold base files in place — full page build paused pending Topher review.

Next: Topher reviews design library + design research; greenlight to resume Astro page build (homepage hero → service hubs → intake → about/contact/privacy) · Topher (review) → Vegas (page build)

Contract signed

(1)

Paved By Infiniti

paved-by-infiniti

Brand locked. Production site is placeholder. Build/contract in process.

Next: Close contract with Sean, then scaffold Astro project and start build · Topher

Agency / operations

(1)

Aspire Digital LLC

aspire-digital-llc

The agency itself — pick this when working on processes, templates, agent identity files, or playbook content. NOT the marketing website (that's 'Made By Aspire').

Next: · Linq

📚 Where the COO doctrine lives

Aria's entry point

memory/drawers/aspire-digital/operations.md

Curated map. Load order, the COO Rule, depth test, specialist registry, three-stage pipeline.

Authoritative standard

~/projects/aspire-digital/ASPIRE.md

Mission, cardinal rules, work flow, three-stage pipeline.

Linq's archived doctrine

aspire-digital/agents/_archived/linq/AGENTS.md

The COO Rule + Depth Test (load when tempted to write a checklist).

Tools & credentials

aspire-digital/agents/_archived/linq/TOOLS.md

Three-stage pipeline auth, CF tokens, Crawl, GHL, NAS, designlang.

🗂️ Client hubs

One sub-page per client — every brief, meeting summary, and tracker Aria built, plus live site links. This is the front door for client-specific work. Clients with internal docs are listed first.

📚 Internal playbooks (for specialists)

Specs the specialist agents (Circa, Vegas, Sahara, Strat, Paris) read as canon when operating across the 10 clients. Each is part of CLI-51 "the gate" — internal-setup baseline first, serial client rollout second.

External surfaces